COMMERCIAL • RESIDENTIAL

Epoxy Floor Coatings in Meridian, MS

An epoxy floor turns bare concrete into a sealed, cleanable, chemical-resistant surface. The result depends almost entirely on how the slab is prepared before the first coat.

Finished specialty concrete floor coating by ACo. Painting
Stained and sealed concrete floor — specialty coating work. Photographed on an ACo. Painting job site.

Where epoxy floors make sense

  • Residential garages and workshops
  • Commercial warehouses and production floors
  • Automotive shops and equipment bays
  • Retail back-of-house and storage areas
  • Commercial kitchens and utility spaces
  • Basements and utility rooms

Finish options include solid color, decorative flake broadcast, metallic, and a clear topcoat over stained concrete. Non-slip aggregate can be added to any of them where the floor gets wet.

Preparation is the whole job

Epoxy that peels up in sheets was almost always rolled over a slab that was never opened up. Concrete has to be mechanically profiled — diamond grinding or shot blasting — so the coating can key into the surface. Acid etching alone does not reliably get there.

Our sequence: degrease and remove oil contamination, mechanically grind the slab, repair cracks and spalls, test for moisture vapor transmission, prime, then build the coating in coats with the flake or aggregate broadcast into the wet layer.

Moisture testing matters more than people expect in Mississippi. A slab poured without a vapor barrier will push moisture up through the concrete and delaminate a coating from underneath no matter how good the epoxy is. We test first and use a moisture-tolerant primer when the numbers call for it.

Cure time and use

Plan on the floor being out of service for several days. Foot traffic typically returns after about 24 hours, vehicle traffic after several days, and full chemical resistance develops over roughly a week. Driving a car onto a coating that has not fully cured leaves hot-tire pickup marks that cannot be buffed out.

Answers

Epoxy Floors — common questions

How long does an epoxy garage floor last?

A professionally installed epoxy floor over a properly ground and primed slab typically lasts many years under normal residential garage use. Commercial floors with forklift traffic wear faster and are usually specified with a heavier build and a urethane topcoat.

Why does epoxy floor coating peel?

Almost always because of preparation. If the slab was not mechanically ground to an open profile, if oil contamination was left in the concrete, or if moisture is migrating up through a slab with no vapor barrier, the coating will release. Grinding, degreasing, and moisture testing prevent all three.

Can you epoxy a garage floor with cracks?

Yes. Cracks and spalled areas are routed, filled, and ground flush before coating. Structural cracks that are still moving need to be addressed differently, and we will tell you if that is what we are looking at.

How long before I can park on a new epoxy floor?

Foot traffic is usually fine after about 24 hours, but vehicles should stay off for several days. Parking too early causes hot-tire pickup, where the tires lift the coating off the slab.

Invest in quality

Need epoxy floors done right?

Set up your appointment today to secure your Professional Free Estimate.

Prefer to talk? Call Jase Clearman at (601) 479-2905.

Get a Free Estimate